SECTIONAL REPLACEMENT WORK ON LEAKING SPOT

project Details

Client: Nigeria Gas Company
Project Start: 25/07/2015
Project Completed: 14/08/2015

Brochure

Download our document to see specific data of the service and how we work.

BROCHURE.DOC
1.25M
BROCHURE.PDF
3.81M

Let’s Start Work
Together

Please feel free to contact us. We will get back to you with 1-2 business days. Or just call us now.

About Project

The repaired pipeline is a 24’’ diameter pipe line conveying gas from Warri to Oben-Ajaokuta. The leak point was located at Ekperi Community. The damaged section of the first point was cut out and a spool of 72.5m was welded, X-ray, wrapped, concrete doped and tied-in to the existing line. The 24” CWC Gas Pipeline at Ekperi Community repair maintenance was carried out around KP127+900, and total of 6 CWC pipes sectional replacement was carried out at 36meters to and from leak spot

Costumers Wishes

NGC monitoring team should be highly commended for their time, effort and sacrifices to monitor all the stages of the job irrespective of weather conditions and made meaningful contributions at each stage. NGC team also must be emulated for their friendly disposition all through the period. Client should properly flush line as many times as possible before engaging contractor for repairs to avoid incidences and emergencies. Client should ensure that the right drawings for a facility is available to the contractor before moving to site in other not to temper with other ground facilities. There should be provision for timber mat for personnel’s and equipments to gain access to site in the event of high or low tide.

Our Approach And Solution

The project was executed in the sequence as stated bel